Shoulder joint replacement waiting time at Dubbo Hospital
Half of patients at Dubbo Hospital waited 388 days or less for shoulder joint replacement in 2024–25 (AIHW MyHospitals, released 28 May 2026). This public hospital is in the Dubbo area of New South Wales.
Reference period 2024–25 (1 July 2024 to 30 June 2025) · released 28 May 2026.
These figures describe surgery that already happened, not your own wait.
- Median wait
- 388 days2024–25 · released 28 May 2026
- Surgeries completed
- 34 surgeries2024–25 · released 28 May 2026
- Waited more than 365 days
- not published2024–25 · released 28 May 2026 — Reported data did not meet the criteria to calculate this indicator.
Half the people who had this surgery here waited less than the median, and half waited longer. Of the 89 public hospitals that published a median wait for this surgery in 2024–25, this one sits at 83 when they are ordered from shortest median to longest. Hospitals with the same median share a rank.
The median wait here has risen from 334 days in 2016–17 to 388 days in 2024–25 — up 16% — while the national median rose from 147 days to 174 days. The nearest public hospital with a shorter published wait is Orange Health Service, about 128 km away, at 147 days.
Compare this near you → On the compare page, pick "Shoulder joint replacement" and type your suburb to see the public hospitals within reach, ordered by their published wait. Nothing you type there is kept.
How this compares
| Where | Median wait | Waited more than 365 days | Surgeries |
|---|---|---|---|
| Dubbo Hospital | 388 days | not published | 34 surgeries |
| New South Wales (all public hospitals) | 325 days | 30.9% | 912 surgeries |
| Australia (all public hospitals) | 174 days | 20.4% | 2417 surgeries |
Where the wait is shorter nearby
Bars show the median wait in days. The vertical line at 174 days marks the national median.
Orange Health Service, NSW · about 128 km away: 147 days
Bathurst Base Hospital, NSW · about 157 km away: 364 days
Hawkesbury Hospital, NSW · about 256 km away: 335 days
Nepean Hospital, NSW · about 258 km away: 239 days
Mount Druitt Hospital, NSW · about 267 km away: 328 days
Fairfield Hospital, NSW · about 279 km away: 366 days
Maitland Hospital, NSW · about 280 km away: 428 days
Westmead Hospital, NSW · about 281 km away: 321 days
Distances are straight-line, measured between hospital locations, and are approximate. The search covered 500 km — the radius was widened because fewer than four hospitals published a figure within 250 km.
How the wait has changed
- Dubbo Hospital
- NSW
- Australia
View these numbers as a table
| Reference period | Dubbo Hospital (days) | NSW (days) | Australia (days) |
|---|---|---|---|
| 2016–17 | 334 | 271 | 147 |
| 2017–18 | 276 | 254 | 152 |
| 2018–19 | 320 | 270 | 163 |
| 2019–20 | 95 | 279 | 154 |
| 2020–21 | 311 | 346 | 246 |
| 2021–22 | 282 | 335 | 218 |
| 2022–23 | 328 | 346 | 254 |
| 2023–24 | 359 | 311 | 192 |
| 2024–25 | 388 | 325 | 174 |
Public hospitals only — what these figures include and leave out.
All surgery at Dubbo Hospital · Shoulder joint replacement across Australia · Shoulder joint replacement in New South Wales · All surgery waits in New South Wales